Smith Elementary School Project Scope of Work

  1. Renovate existing HVAC system to meet new ASHRAE standards
  2. Renovate electrical service to building
  3. Improve the drainage in the courtyard
  4. Construct walls and doors to enclose the open concept classrooms
  5. Improve drainage in parking areas and playground
  6. Replace existing casement windows in older classrooms
  7. Replace exterior door-frames from classrooms into courtyard area
  8. Replace all existing ceiling tile
  9. Renovate administration area
  10. Furnish additional staff restrooms
  11. Relocate light switches in back pods
  12. Renovate water fountains to meet ADA
  13. Replace VCT floor tile in older classrooms
  14. Renovate existing restrooms to meet ADA
  15. Renovate stage access to meet ADA
  16. Install fully automatic fire sprinkler system

Current Activity

Project is complete.

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Smith Elementary School
Page: 1 2 3 Next
 Sort By  
Teacher Lounge (01/05/07)
   <br>
  
Work Room (01/05/07)
   <br>
  
Principal's Office (01/05/07)
   <br>
  
New Hall Floor (01/05/07)
   <br>
  
Student's Restroom (01/05/07)
   <br>
  
Teacher Lounge 2
   <br>
  
Pod Hall (01/05/07)
   <br>
  
Nurse's Office (01/05/07)
   <br>
  
Office Waiting Area (01/05/07)
   <br>
  
Pod Hall 2 (01/05/07)
   <br>
  
Cafeteria (1/05/07)
   <br>
  
Gym (01/05/07)
   <br>
  
Courtyard Hall (01/05/07)
   <br>
  
Library (01/05/07)
   <br>
  
Class (1/05/07)
   <br>
  
Front Entry Looking Out (01/05/07)
   <br>
  
Hall2 (01/05/07)
   <br>
  
Library2 (01/05/07)
   <br>
  
Class2 (1/05/07)
   <br>
  
Hall (01/05/07)
   <br>
  
Front Entry (01/05/07)
   <br>
  
Gym2 (01/05/07)
   <br>
  
Computer Lab (01/05/07)
   <br>
  
Boiler pump (10/20/06)
   <br>
  
Regulators on pump (10/20/06)
   <br>
  
New Boiler (1) (6/20/06)
   <br>
  
Class 3 (1) (8/14/06)
   <br>
  
Class 3 (8/14/06)
   <br>
  
class (8/14/06)
   <br>
  
New doors ready to be installed (8/14/06)
   <br>
  
Installing new sink (8/14/06)
   <br>
  
Mech room (8/7/06)
   <br>
  
Work in class (8/7/06)
   <br>
  
waxed floor class room (8/9/06)
   <br>
  
work in toilet (8/7/06)
   <br>
  
New boiler (8/7/06)
   <br>
  
New office (8/9/06)
   <br>
  
Stage area (8/9/06)
   <br>
  
new desk (8/9/06)
   <br>
  
Office (8/7/06)
   <br>
  
New flooring (8/4/06)
   <br>
  
New tile work (7/24/06)
   <br>
  
grinding floor (8/1/06)
   <br>
  
New grass (7/24/06)
   <br>
  
new fire riser (7/28/06)
   <br>
  
new toilet (8/1/06)
   <br>
  
new transformer (8/1/06)
   <br>
  
got milk (8/1/06)
   <br>
  
Fire suppression tree (8/4/06)
   <br>
  
Getting walls ready for sheet rock (7/24/06)
   <br>
  
Toilet (8/4/06)
   <br>
  
Toilets installed (7/24/06)
   <br>
  
sidewalk ramp (7/28/06)
   <br>
  
Hall at entry (7/28/06)
   <br>
  
Installing clg (8/4/06)
   <br>
  
Ceiling tile (7/24/06)
   <br>
  
Pressure test (7/24/06)
   <br>
  
new cab (8/1/06)
   <br>
  
Pump riser (7/28/06)
   <br>
  
new control stystem (8/1/06)
   <br>
  
putting new clg tile (8/1/06)
   <br>
  
pod entry (8/1/06)
   <br>
  
New door and window frame (7/28/06)
   <br>
  
New screen wall (8/4/06)
   <br>
  
New ramp (7/24/06)
   <br>
  
new hvac equip installed (8/1/06)
   <br>
  
New screenwall (7/28/06)
   <br>
  
New sink frame (7/24/06)
   <br>
  
New paint and floors (7/24/06)
   <br>
  
new mech equip (8/1/06)
   <br>
  
Drinking fountain (7/19/06)
   <br>
  
Closing a door (7/19/06)
   <br>
  
Communication cables (7/19/06)
   <br>
  
Instal new tile (7/19/06)
   <br>
  
Stored Cabinets (7/19/06)