Seguin Elementary School Scope of Work

  1. Remove asbestos floor tile in the classrooms
  2. Upgrade electrical service and furnish additional outlets in the classrooms
  3. Furnish new building communication system
  4. Furnish new fully automatic fire alarm system
  5. Replace flooring in all restrooms
  6. Furnish an ADA ramp at the bus drop off area
  7. Renovate restrooms to meet ADA standards
  8. Renovate the stage to meet ADA standards
  9. Renovate the water fountains to meet ADA standards
  10. Renovate the HVAC system to meet new ASHRAE standards
  11. Furnish additional HVAC to the locker rooms
  12. Renovate casework in all classrooms
  13. Remove lockers from the corridores
  14. Renovate the administration area
  15. Replace the roof
  16. Improve drainage at the student drop off area
  17. Furnish an aluminum canopy at the cafeteria for student drop off

Current Activity

Project is complete.

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Seguin Elementary School
Page: 1 2 3 Next
 Sort By  
Art Storage (01/05/07)
Back ramp (7/13/06)
boys toilet fixtures (7/25/06)
Build new ramp (7/28/06)
Cabinets salvaged (06/12/06)
Cable tray (7/28/06)
Cafateria (8/14/06)
cafateria fire suppression (7/25/06)
Cafeteria (01/05/07)
cafeteria (1) (8/23/06)
ceiling demolished (7/31/06)
Ceiling Demolition (7/28/06)
Ceiling tile stored on site (06/26/06)
Ceiling work (06/26/06)
Centeral elec junction box (7/31/06)
Class (3) (06/08/06)
Class (8/29/06)
class cabinets (7/31/06)
Class Demolition (06/15/06)
class ready (8/1/06)
Class ready for finished (06/28/06)
Class Ready for Treatment (05-30-06)
Class Room (01/05/07)
Class Room Demolition (8) (06/06/06)
Class Room2 (01/05/07)
Cleaning the remains of the old floor off (7/13/06)
closing in old door (7/12/06)
Communications room (7/31/06)
Computer Lab (01/05/07)
Conc patch (07/06/06)
Construction Trailer (05-20-06)
contractor trailor 2 (5/18/06)
contractors trailor (5/18/06)
controls (7/25/06)
Covered School Materials (06/06/06)
Delivering mech parts (7/12/06)
Demolished Lockers(4) (06/06/06)
Demolished toilet wall (06/20/06)
Demolition in Mech Rm (06/15/06)
Demolition of ceiling (8/4/06)
Dining Area (01/05/07)
Door Frame detail (06/28/06)
Door frame detail2 (06/28/06)
Door to Gym (01/05/07)
drinking fountain (2) (8/29/06)
Elec. conduit (06/26/06)
Entry (01/05/07)
Entry at school (8/29/06)
Fire pipe (7/13/06)
fire system in cafiteria (7/25/06)
fire water supply (8/14/06)
Floor Removed in Nurse Office (06/06/06)
Framing new doors (06/12/06)
Framing new hall wall (06/29/06)
Framing new wall and door (7/11/06)
Front entery (7/28/06)
front entry (1) (8/23/06)
Front of Bldg (06/19/06)
Front of School (05-20-06)
Front ramp correctly framed (7/13/06)
Glue for new floor (7/28/06)
gym 1 (5/18/06)
gym 2 (5/18/06)
Gym AC (5/18/06)
Gym2 (01/05/07)
Gym3 (01/05/07)
Hall (01/05/07)
hall 3 (2) (8/23/06)
Hall being repaired (06/28/06)
Hall Demolition (06/06/06)
Hall2 (01/05/07)
Installing cabinets (7/25/06)
Installing fire supperession pipe (06/15/06)
Installing new ceiling (7/28/06)
Laying out Fire pipe (06/20/06)