Construction Updates
 
 

Beasley Elementary School Project Scope of Work

  1. Upgrade HVAC system to meet new ASHRAE standards
  2. Furnish fire alarm system
  3. Construct walls and doors to enclose open concept systems
  4. Furnish additional ADA parking spaces
  5. Renovate clinic restroom to meet ADA standards
  6. Furnish an isolation room in the clinic
  7. Repair roof
  8. Renovate restrooms to meet ADA standards
  9. Renovate stage to meet ADA standards
  10. Replace HVAC boiler
  11. Furnish an automatic fire sprinkler system throughout the building

Project Highlights

  • SHW presented schematic design / design development at the November School Board meeting.
  • Technology Review meeting is scheduled for December 5.
  • Design Committee meeting is scheduled for December 6.
  • 70% Construction Documents are scheduled to be delivered for review on December 6.
  • Preliminary specifications for asbestos abatement have been received

 

Current Activity

 

Project is complete.

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Beasley Elamentary School
Page: 1 2 Next
 Sort By  
Adjust Gas Regulator (11/2/06)
   <br>
  
Adusting AC control (11/2/06)
   <br>
  
Fire suppression vaulves (11/2/06)
   <br>
  
Boiler training (5) (10/27/06)
   <br>
  
Boiler training (2) (10/27/06)
   <br>
  
New staff toilet (1) (10/27/06)
   <br>
  
New staff toilet (2) (10/27/06)
   <br>
  
Air Conditioning (2) (10/27/06)
   <br>
  
Adjust Gas Regulator (1) (11/2/06
   <br>
  
Air Conditioning (10/27/06)
   <br>
  
entry2 (1) (9/29/06)
   <br>
  
Exterior of bldg (1) (9/29/06)
   <br>
  
hall 2 (2) (9/29/06)
   <br>
  
entry2 (2) (9/29/06)
   <br>
  
hall 2 (6) (9/29/06)
   <br>
  
office area (1) (9/29/06)
   <br>
  
hall (9/29/06)
   <br>
  
entry to pods (2) (9/29/06)
   <br>
  
entry to pods (1) (9/29/06)
   <br>
  
Exterior of bldg (3) (9/29/06)
   <br>
  
gym2 (9/29/06)
   <br>
  
hall 2 (1) (9/29/06)
   <br>
  
gym2 (1) (9/29/06)
   <br>
  
office area (3) (9/29/06)
   <br>
  
hall 2 (11) (9/29/06)
   <br>
  
hall 2 (13) (9/29/06)
   <br>
  
Exterior of bldg (5) (9/29/06)
   <br>
  
faculty toilet (9/29/06)
   <br>
  
faculty toilet (1) (9/29/06)
   <br>
  
student toilet (4) (9/29/06)
   <br>
  
student toilet (5) (9/29/06)
   <br>
  
classes (11) (9/29/06)
   <br>
  
Library (2) (9/29/06)
   <br>
  
cafateria (2) (9/26/06)
   <br>
  
cafateria (1) (9/26/06)
   <br>
  
temp class room (9/29/06)
   <br>
  
cafateria (9/26/09)
   <br>
  
classes (13) (9/29/06)
   <br>
  
classes (6) (9/26/06)
   <br>
  
classes (7) (9/29/06)
   <br>
  
staff lounge (9/29/06)
   <br>
  
classes (17) (9/29/06)
   <br>
  
classes (23) (9/29/06)
   <br>
  
Pod (8/11/06)
   <br>
  
AC Equipment (8/11/06)
   <br>
  
Drinking Fountain (8/11/06)
   <br>
  
Stage (8/11/06)
   <br>
  
Class (8/11/06)
   <br>
  
Library (8/11/06)
   <br>
  
New class (7/21/06)
   <br>
  
New water fountain (7/21/06)
   <br>
  
Mech yard (7/21/06)
   <br>
  
Toilet tile (7/21/06)
   <br>
  
elec panel (7/21/06)
   <br>
  
Roofing (7/21/06)
   <br>
  
building transportable class (7/21/06)
   <br>
  
Cabinets (7/21/06)
   <br>
  
Stored materials (7/21/06)
   <br>
  
entry ceiling (7/21/06)
   <br>
  
Framing new class (7/21/06)
   <br>
  
Entry (7/21/06)
   <br>
  
Welding new pipes (7/14/06)
   <br>
  
New ramp (7/14/06)
   <br>
  
new power panel (7/14/06)
   <br>
  
New Pavements (7/14/06)
   <br>
  
New equipment (7/14/06)
   <br>
  
Reair of roof (7/14/06)
   <br>
  
Ready to paint (7/14/06)
   <br>
  
Old hvac equip (7/14/06)
   <br>
  
New sidewalk (7/14/06)
   <br>
  
Site work (7/14/06)
   <br>
  
Reusing cabints (7/14/06)
   <br>
  
New cabinets (7/14/06)
   <br>
  
New water line (7/7/06)
   <br>
  
Hall ceiling (7/7/06)
   <br>
  
Page: 1 2 Next
Showing item(s) 1 - 75 of 143 
 
     
 