Saturday, September 04, 2010

Login
 
Construction Updates
 
 

Austin Elementary School Project Scope of Work

  1. Replace sound system
  2. Furnish ADA access to the stage
  3. Renovate existing restrooms to meet ADA standards
  4. Furnish glass lights in all interior classroom doors
  5. Replace accoustical panels in the music room
  6. Furnish an automatic fire sprinkler system

Current Activity

Project is complete.

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Austin Elementary School
Page: 1
 Sort By  
New Water Fountain (10/06/06)
   <br>
  
Comm training (10) (10/12/06)
   <br>
  
transformer (10/12/06)
   <br>
  
New Security Door (10/06/06)
   <br>
  
Comm training (15) (10/12/06)
   <br>
  
elec panel (10/12/06)
   <br>
  
New Door (8/14/06)
   <br>
  
New door window (8/14/06)
   <br>
  
Security Door (8/14/06)
   <br>
  
New Toilets (1) (8/14/06)
   <br>
  
Installed accoustical panels in music room (8/10/06)
   <br>
  
Ready for door piviot (8/10/06)
   <br>
  
Control door (8/10/060
   <br>
  
sinks in toilet (8/10/06)
   <br>
  
New lites in place (8/10/06)
   <br>
  
toilet (8/10/06)
   <br>
  
spring has sprung (7/20/06)
   <br>
  
ready for drinking fountains (7/28/06)
   <br>
  
New window in door (7/28/06)
   <br>
  
first coat of paint (7/28/06)
   <br>
  
new door on hall (8/2/06)
   <br>
  
speakers in hall installed (7/28/06)
   <br>
  
Patched tile (7/28/06)
   <br>
  
Painted frame (7/28/06)
   <br>
  
fresh paint on door frame (7/28/06)
   <br>
  
New toilets (7/20/06)
   <br>
  
new door windows (8/2/06)
   <br>
  
New window in door and paint on frame (7/28/06)
   <br>
  
New doors (7/20/06)
   <br>
  
New speakers (7/28/06)
   <br>
  
Cabinets in music room (8/2/06)
   <br>
  
New foor frame (7/20/06)
   <br>
  
Veiw from the office (8/2/06)
   <br>
  
Ready for New finishes (7/21/06)
   <br>
  
Wall in Music Rm (7/21/06)
   <br>
  
New transfromer (7/21/06)
   <br>
  
Front entry of school (7/12/06)
   <br>
  
New drinking water fountain (7/12/06)
   <br>
  
Cabinets to be installed in music room (7/12/06)
   <br>
  
New wall and door (7/12/06)
   <br>
  
Testing speaker circuts (7/12/06)
   <br>
  
Demolition in toilet (7/12/06)
   <br>
  
Ceiling repair (06/29/06)
   <br>
  
Front entry2 (06/29/06)
   <br>
  
New security camera (06/29/06)
   <br>
  
ceiling work (06/29/06)
   <br>
  
Retainer clips for com system (06/29/06)
   <br>
  
Toilet repair (06/29/06)
   <br>
  
Front entry (06/29/06)
   <br>
  
Ready for a New Speaker (06/29/06)
   <br>
  
Salvaged Cabinets1 (06/12/06)
   <br>
  
Library office (06/12/06)
   <br>
  
Library (06/12/06)
   <br>
  
Safety fence (06/12/06)
   <br>
  
class demolition (06/12/06)
   <br>
  
Working on Fire Sprinkler1 (06/12/06)
   <br>
  
cabinets to be reused (06/12/06)
   <br>
  
Packed up and ready to go (06/07/06)
   <br>
  
Austin 3 (06/07/06)
   <br>
  
Packed up and ready to go 2 (06/07/06)
   <br>
  
Austin 2 (06/07/06)
   <br>
  
Austin 1 (06/07/06)
   <br>
  
Page: 1
Showing item(s) 1 - 62 of 62 
 
     
 

Terms Of Use  Privacy Statement  

 2004 Lamar CISD