Construction Updates
 
 

George Junior High School Project Scope of Work

 

1.                  Install new automatic fire alarm system

2.                  Upgrade communication system

3.                  Relocate existing student lockers

4.                  Upgrade HVAC system to meet ASHRAE standards

5.                  Install new cooling tower

6.                  Add exhaust system and fume hoods at science rooms

7.                  Enclose open concept classrooms

8.                  Replace ceiling tiles

9.                  Replace remaining roof areas

10.              Replace carpet in cafeteria with tile

11.              Replace carpet in Forum

12.              Renovate girls locker room to create major sports area

13.              Upgrade restrooms to meet ADA code

14.              Upgrade water fountains to meet ADA code

15.              Install new carpet throughout building

16.              Update science labs to meet ADA standards

17.              Add handicap access to teaching forum

18.              Consolidate entry access to improve supervision

19.              Renovate shop areas

20.              Renovate art rooms

21.              Create separation of Asst Principal’s office from reception area

 

 

Project Highlights

 

This project will be a major renovation to allow the school to better handle the growing student population.  Major items include replacement of half of the roof, replacement of the cooling tower, upgrade to the HVAC system, enclose open concept classrooms, ADA upgrades, and finish upgrades.

 

Gilbane and the Architect, SHW Group have had several meetings with the design committee to discuss the project scope.  In addition, there have been several meetings with the principal and maintenance department to discuss this project.

 

The project is currently nearing the end of the schematic design phase.  Periodic meetings will take place until the completion of contract documents.

 

Current Activity

 

Project is complete.

 

 

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
George Junior High School Picture Gallery
Page: 1 2 Next
 Sort By  
New Sign1 (06/11/06)
   <br>
  
New Sign2 (06/11/06)
   <br>
  
Digging Beam 2 (03-08-06)
   <br>
  
Conc Pumping Truck (03-08-06)
   <br>
  
Hall and Class Ready for New Work (03-08-06)
   <br>
  
Dirt Work (03-08-06)
   <br>
  
New Fire Sprinkler (1-18-06)
   <br>
  
New Floor In Forum (1-18-06)
   <br>
  
Covering to Protect Walls During Spray Painting in Forum (1-18-06)
   <br>
  
New Carpet In Forum (1-18-06)
   <br>
  
Classroom Cabinetry (05-12-12)
   <br>
  
Corridor Wall Finish (12-12-05)
   <br>
  
Men's Bathroom Renovation (12/14/05)
   <br>
  
Phase II Corridor Renovation (10-27-05)
   <br>
  
Phase II Renovation Corridor (10-18-05)
   <br>
  
Entry Canopy (10-27-05)
   <br>
  
Phase II Classroom Renovation (10-28-05)
   <br>
  
Phase II Classroom Renovation (11-01-05)
   <br>
  
Phase II Classroom Renovation (10-24-05)
   <br>
  
Phase II Renovation Classroom (10-18-05)
   <br>
  
Phase II Restroom Renovation (10-24-05)
   <br>
  
Remodeled Cafeteria (10-11-05)
   <br>
  
Phase II Restroom Remodel (09-19-05)
   <br>
  
Phase II Remodel (09-27-05)
   <br>
  
Phase II Remodel (09-19-05)
   <br>
  
Phase II Classroom Wall Studs (10-03-05)
   <br>
  
Phase II Remodel (09-13-05)
   <br>
  
Phase II Classroom Wall Studs (10-03-05)
   <br>
  
Phase 2 Classroom (09/01/05)
   <br>
  
Renovated Locker Area (09/01/05)
   <br>
  
Attendance Office (08-08-05)
   <br>
  
Admin Office (08-08-05)
   <br>
  
Typical Classroom (08-08-05)
   <br>
  
Restroom Fixtures (08-06-05)
   <br>
  
Restroom Green Board (07-28-05)
   <br>
  
Restroom Tile (08-01-05)
   <br>
  
Typical Cabinets (08-08-05)
   <br>
  
Classroom VCT (08-01-05)
   <br>
  
Classroom Setup (08-06-05)
   <br>
  
Classroom at Wood Shop (08-08-05)
   <br>
  
Classroom Millwork (08-06-05)
   <br>
  
Toilet Partition (08-08-05)
   <br>
  
Typical Hall Fire Doors (08-08-05)
   <br>
  
Dining Area (08-08-05)
   <br>
  
Typical Hall (08-08-05)
   <br>
  
Hall at Attendance Office (08-08-05)
   <br>
  
Dining Area (08-08-05)
   <br>
  
Typical Classroom (08-08-05)
   <br>
  
Fence at Cooling Tower (08-08-05)
   <br>
  
Cooling Tower Pump (08-08-05)
   <br>
  
Dining Area (08-08-05)
   <br>
  
Corridor Walls (07-28-05)
   <br>
  
Lab Room (08-08-05)
   <br>
  
Restroom Fixtures (08-06-05)
   <br>
  
Cafeteria Ceiling Grid Installation (07-18-05)
   <br>
  
Cafeteria Ceiling Grid Installation (07-18-05)
   <br>
  
New Carpet Installation (07-15-05)
   <br>
  
New Carpet Installation (07-15-05)
   <br>
  
Restroom Tile (07-11-05)
   <br>
  
New VCT Flooring (07-11-05)
   <br>
  
Concrete Walk Installation (07-05-05)
   <br>
  
Drywall Installation (06-27-05)
   <br>
  
Drywall Installation (06-27-05)
   <br>
  
Classroom Wall Insulation (06-28-05)
   <br>
  
Metal Stud Installation (06-27-05)
   <br>
  
Sprinkler Pipe Installation (06-24-05)
   <br>
  
Demolition Activities (06-24-05)
   <br>
  
New Wall Construction (06-24-05)
   <br>
  
New Wall Construction (06-15-05)
   <br>
  
Classroom Wall Construction (06-20-05)
   <br>
  
Cooling Tower (06-20-05)
   <br>
  
Restroom Wall Construction (06-20-05)
   <br>
  
Restroom Demolition (06-15-05)
   <br>
  
Flooring Demolition (06-15-05)
   <br>
  
Locker Removal (06-09-05)
   <br>
  