Terry High School Project Scope of Work

  1. Upgrade HVAC systems to meet ASHRAE standards
  2. Replace the existing Cooling Tower
  3. Replace the roof
  4. Resurface the running track
  5. Improve the accoustics in the band hall
  6. Renovate restrooms and drinking fountains to meet ADA standards
  7. Construct a multi-purpose space to be primarily used by the Drill Team, Cheerleaders, and Color Guard
  8. Install automatic fire sprinkler system

 

Project Highlights  

 

This project will be a small addition and renovation to the existing school campus.  Major items include replacement of the roof, replacement of the cooling towers, upgrade to the HVAC systems, ADA upgrades, replacement of the track surface, miscellaneous interior renovations, and a multi-purpose space for the drill team.  A small HVAC remodel at the Natatorium will be included with this project.

 

Gilbane and the Architect, SHW Partners, had an initial meeting with the design committee on August 9, 2004 to discuss the project scope and key design elements.  In addition, there have been meetings with the principal and maintenance department to discuss this project.

 

The project is currently in the schematic design phase.  Periodic meetings will take place until the completion of contract documents.

 

Current Activity

 

Project is complete.

 

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Terry High School
Page: 1
 Sort By  
Dance Room Addition Interior (11-03-05)
   <br>
  
Dance Room Addition Interior (11-03-05)
   <br>
  
Dance Room Addition Roof Membrane (10-04-05)
   <br>
  
Dance Room Addition Roof Deck (09-27-05)
   <br>
  
Dance Room Addition Exterior Waterproofing (09-19-05)
   <br>
  
Dance Room Addition Sheetrock Insulation (10-07-05)
   <br>
  
Dance Room Addition Interior Wall Studs and Ductwork (09-27-05)
   <br>
  
Dance Room Addition Insulation Board (10-07-05)
   <br>
  
New Cooling Tower (10-11-05)
   <br>
  
Dance Room Addition Slab (09-02-05)
   <br>
  
Dance Room Addition Structural Steel (08-11-05)
   <br>
  
Pipe Insulation (08-16-05)
   <br>
  
New Pumps (08-08-05)
   <br>
  
Restroom Tile (07-28-05)
   <br>
  
New Cooling Tower (08-08-05)
   <br>
  
Boy's Restroom (08-08-05)
   <br>
  
Typical Classroom (08-08-05)
   <br>
  
Dining Area (08-08-05)
   <br>
  
New Cooling Tower Base (07-11-05)
   <br>
  
Pole Vault Area (06-29-05)
   <br>
  
Long Jump Box (06-28-05)
   <br>
  
Building Addition Pad (07-07-05)
   <br>
  
Restroom Remodel (07-19-05)
   <br>
  
New Cooling Tower (07-22-05)
   <br>
  
Football Field Sod (06-29-05)
   <br>
  
Long Jump Box (06-28-05)
   <br>
  
Field House Air Handler Delivery (06-30-05)
   <br>
  
Field House Chiller Pipe Insulation (07-25-05)
   <br>
  
Field House Chiller Installation (07-12-05)
   <br>
  
Long Jump Box (06-24-05)
   <br>
  
Track Surface (06-24-05)
   <br>
  
Track Surfacing (06-24-05)
   <br>
  
Cooling Tower Demolition (06-24-05)
   <br>
  
Dance Room Foundation (06-24-05)
   <br>
  
Long Jump Box (06-24-05)
   <br>
  
New Chiller Delivery (06-24-05)
   <br>
  
Track Sub-Base 1 (06-15-05)
   <br>
  
Track Sub-Base 3 (06-20-05)
   <br>
  
Concrete Samples (06-17-05)
   <br>
  
Dance Room Footings (06-17-05)
   <br>
  
Dance Room Footings 1 (06-17-05)
   <br>
  
Track Sub-Base 2 (06-15-05)
   <br>
  
Sidewalk Installation (06-20-05)
   <br>
  
Dance Room Addition Foundation (06-07-05)
   <br>
  
Track Asphalt Installation (06-20-05)
   <br>
  
Sprinkler System Materials (06-15-05)
   <br>
  
Restroom Demolition 1 (06-20-05)
   <br>
  
Restroom Demolition (06-15-05)
   <br>
  
Football Field Grading (06-10-05)
   <br>
  
Track Sub-Base (06-10-05)
   <br>
  
Corridor Floor Protection (06-07-05)
   <br>
  
Concrete Pad Installation (06-07-05)
   <br>
  
Gym Sprinkler Pipe Installation (06-07-05)
   <br>
  
Track Curb Installation (06-07-05)
   <br>
  
Track Curb Form Work (06-07-05)
   <br>
  
Sprinkler System Materials (06-07-05)
   <br>
  
Terry Track Construction 1 (05-25-05)
   <br>
  
Terry Track Construction (05-25-05)
   <br>
  
Terry Track Construction (05-18-05)
   <br>
  
Terry Track Construction (04-28-05)
   <br>
  
Main Entrance to Terry High School (7/23/04)
   <br>
  
Auditorium 1 (7/23/04)
   <br>
  
Terry High School Auditorium
   <br>
  
Track to be Resurfaced
   <br>
  
Existing Cooling Tower
   <br>
  
Existing Site 2
   <br>
  
Existing Site
   <br>
  
Page: 1
Showing item(s) 1 - 67 of 67 
 
     
 

Terms Of Use  Privacy Statement  

 2004 Lamar CISD