Lamar Junior High School Project Scope of Work

  1. Expand and renovate existing administration area
  2. Refurbish exterior building including replacement of all exterior windows
  3. Expand and renovate existing library
  4. Renovate all existing instructional classrooms
  5. Renovate all existing restrooms to meet ADA standards
  6. Renovate all existing corridors
  7. Renovate older science classrooms to meet new TEA standards
  8. Renovate all existing departmental offices and workrooms
  9. Renovate existing locker rooms and showers
  10. Renovate existing gymnasiums
  11. Renovate existing vocational areas to meet needs of new programs
  12. Expand and renovate the music area
  13. Enclose one existing courtyard to add needed additional classrooms and administration space
  14. Add minor addition for new weight room
  15. Renovate Home Economics to meet the needs of present programs
  16. Replace approximately 50% of existing roof area
  17. Improve drainage around entire site
  18. Upgrade HVAC systems to meet new ASHRAE standards
  19. Furnish additional electrical outlets at classrooms and offices
  20. Renovate existing bus drop off canopy
  21. Replace all building doors and hardware
  22. Construct ramps to make all areas of the building ADA accessable
  23. Replace all student lockers
  24. Remove asbestos floor tile and other asbestos-containing material throughout the building
  25. Furnish additional security lighting at the exterior of the building
  26. Furnish additional staff restrooms throughout the building
  27. Upgrade electrical service to the building
  28. Construct a stage
  29. Furnish an automatic fire sprinkler system

Current Activity

The contractor continues to work on the completion list items.

 

 

 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Lamar Junior Junior High School Project Photo Gallery
Page: 1 2 3 Next
 Sort By  
Library 2 (2/15/07)
   <br>
  
Library 2 jpg (2/15/07)
   <br>
  
Hall 3 jpg (2/15/07)
   <br>
  
Toilet boys (2/15/07)
   <br>
  
Toilet boys 1 (2/15/07)
   <br>
  
Water Fountain (2/15/07)
   <br>
  
Book room (2/15/07)
   <br>
  
Classroom 3 jpg (2/15/07)
   <br>
  
New cabinets 1 (2/15/07)
   <br>
  
New Cabinets (2/15/07)
   <br>
  
Classroom 2 (2/15/07)
   <br>
  
Hall 3 (2/15/07)
   <br>
  
Com room (2/15/07)
   <br>
  
classroom 3 (2/15/07)
   <br>
  
Replace roof (9/11/06)
   <br>
  
Stored door frames (9/11/06)
   <br>
  
New Plumbing (9/11/06)
   <br>
  
New wing takes shape (9/11/06)
   <br>
  
Stored fire pipe (9/11/06)
   <br>
  
Bldg framing (9/11/06)
   <br>
  
Structural steel frame joint (9/11/06)
   <br>
  
temporary bracing (9/11/06)
   <br>
  
New copper line (8/21/06)
   <br>
  
New addtion (8/21/06)
   <br>
  
interior slab work (8/21/06)
   <br>
  
Clearing out room for work (8/21/06)
   <br>
  
New Power Panels (8/21/06)
   <br>
  
getting ready to work in class (8/21/06)
   <br>
  
Remediation work (8/21/06)
   <br>
  
filled in door (8/21/06)
   <br>
  
Remediation 2 (8/21/06)
   <br>
  
Foundation (8/21/06)
   <br>
  
Class (8/11/06)
   <br>
  
Hall (8/11/06)
   <br>
  
We are ready! (8/11/06)
   <br>
  
Shower (8/11/06)
   <br>
  
Locker Room (8/11/06)
   <br>
  
Gym Floor (8/11/06)
   <br>
  
lamar JH (6) (7/31/06)
   <br>
  
new urnial (7/31/06)
   <br>
  
new wing (7/31/06)
   <br>
  
lamar JH (7) (7/31/06)
   <br>
  
treating column (7/31/06)
   <br>
  
work in kitchen (7/31/06)
   <br>
  
new transformers (7/31/06)
   <br>
  
class ready to go (7/31/06)
   <br>
  
lamar JH (1) (7/31/06)
   <br>
  
new brick wall (7/31/06)
   <br>
  
new hall rady to go (7/31/06)
   <br>
  
lamar JH (7/31/06)
   <br>
  
lamar JH (4) (7/31/06)
   <br>
  
Installing new lockers (7/31/06)
   <br>
  
Installing mech duct (6/26/06)
   <br>
  
New ac ducts (6/26/06)
   <br>
  
Fill in door (6/26/06)
   <br>
  
New canopy (6/26/06)
   <br>
  
Grading new parking lot (6/26/06)
   <br>
  
need door frame (6/26/06)
   <br>
  
New sub base for parking (7/11/06)
   <br>
  
Leveling paking area (6/26/06)
   <br>
  
Rolling soil under new slab (7/11/06)
   <br>
  
Lime the parking lot (6/26/06)
   <br>
  
Building new cmu wall (6/26/06)
   <br>
  
area near Gym (06/19/06)
   <br>
  
Girls Locker Rm (06/19/06)
   <br>
  
New Door Frames (06/19/06)
   <br>
  
Cafateria (06/19/06)
   <br>
  
Repair wall (06/19/06)
   <br>
  
Girls Locker Rm 2 (06/19/06)
   <br>
  
New Brick (06/15/06)
   <br>
  
New Tile (06/19/06)
   <br>
  
New Wall (06/19/06)
   <br>
  
Ready for new walls (06/19/06)
   <br>
  
New Unit Ventalators (06/19/06)
   <br>
  
New Site Work (06/19/06)
   <br>
  