Construction Updates
 
 

Lamar Consolidated High School Project Scope of Work

 

 1.  Construct new entry element across the front of the building

 2.  Refurbish exterior of existing auditorium and auxiliary gymnasium

 3.  Renovate and enlarge existing administration area

 4.  Renovate and enlarge existing library

 5.  Renovate all existing instructional classrooms

 6.  Renovate all existing corridors

 7.  Remodel all existing restrooms to meet ADA standards

 8.  Renovate existing science building

 9.  Construct addition to existing science wing

10.  Renovate all existing offices and workrooms

11.  Renovate all existing locker rooms and showers

12.  Renovate existing gymnasiums

13.  Renovate existing vocational building to meet the needs of the new program requirements

14.  Renovate existing ROTC area

15.  Renovate existing auditorium

16.  Renovate and construct a minor addition to the Music and Drama areas

17.  Renovate the Home Economics area

18.  Replace approximately 60% of the existing roof

19.  Improve drainage around the entire site

20.  Upgrade HVAC systems to meet ASHRAE standards

21.  Replace bus drop off canopy

22.  Add ramps and access requirements to meet ADA standards

23.  Replace all student lockers

24.  Remove all asbestos containing materials

25.  Furnish additional security lighting around the site

26.  Furnish additional staff restrooms

27.  Upgrade electrical service

28.  Construct a multi purpose space to be primarily used by the drill team, cheerleaders, and the Color Guard.

 

 

Current Activity

 

The contractor continues to work on the completion list items.

 

 
     
 
Lamar HS Project Photos
 
 
   <b></b>   
Lamar High School Photos
Page: 1 2 3 4 Next
 Sort By  
Toilet (2/15/07)
   <br>
  
Restroom (2/15/07)
   <br>
  
Hallway (2/15/07)
   <br>
  
Lockers (2/15/07)
   <br>
  
toilet 2 (2/15/07)
   <br>
  
New Canopy at High School 4 (01/31/07)
   <br>
  
New Canopy at High School (01/31/07)
   <br>
  
New Canopy at High School 2 (01/31/07)
   <br>
  
New Canopy at High School 3 (01/31/07)
   <br>
  
transformer (1) (10/19/06)
   <br>
  
Mech Rm 2 (3) (10/19/06)
   <br>
  
Cooling tower (1) (10/19/06)
   <br>
  
Locker Rm Floor (10/19/06)
   <br>
  
New pavement (10/19/06)
   <br>
  
Mech Rm 2 (10/19/06)
   <br>
  
Mech Rm 2 (7) (10/19/06)
   <br>
  
New walls and clg (2) (10/19/06)
   <br>
  
New grass and edge at stadium (9/11/06)
   <br>
  
ready for new doors (9/11/06)
   <br>
  
New Plantings (9/11/06)
   <br>
  
repair the roof (9/11/06)
   <br>
  
ceiling work (9/11/06)
   <br>
  
New stud wall (9/11/06)
   <br>
  
Infill door (9/11/06)
   <br>
  
New area drain (9/11/06)
   <br>
  
Stored roofing materials (8/21/06)
   <br>
  
room ready for renovation (8/21/06)
   <br>
  
stored materials (8/21/06)
   <br>
  
ceiling demolition (8/21/06)
   <br>
  
New windows (8/21/06)
   <br>
  
New Air conditioning Equip (8/21/06)
   <br>
  
Remediation isolation at clg (8/21/06)
   <br>
  
Existing elevation (8/21/06)
   <br>
  
New mech piping (8/21/06)
   <br>
  
New building (8/21/06)
   <br>
  
floor removed (8/21/06)
   <br>
  
New panels (8/21/06)
   <br>
  
new furring for gyp bd wall (8/21/06)
   <br>
  
Student Waiting Area (8/11/06)
   <br>
  
Remediation (8/11/06)
   <br>
  
Mechanical Room (8/11/06)
   <br>
  
Cafeteria (8/11/06)
   <br>
  
Entry (8/11/06)
   <br>
  
Hall (8/11/06)
   <br>
  
Gym (8/11/06)
   <br>
  
Band Room (8/11/06)
   <br>
  
New Lockers (7/24/06)
   <br>
  
New Locker2 (7/24/06)
   <br>
  
New transformers (7/24/06)
   <br>
  
Library shelves (7/24/06)
   <br>
  
N ew stoop (7/24/06)
   <br>
  
Replacing old brick (7/11/06)
   <br>
  
Kitchen floor (7/11/06)
   <br>
  
New mech pipes (7/11/06)
   <br>
  
screened area (7/11/06)
   <br>
  
Scaflding at brick (7/11/06)
   <br>
  
Installing new cabinets (7/11/06)
   <br>
  
New Computer desk (7/11/06)
   <br>
  
Painted walls (7/11/06)
   <br>
  
New library desk (7/11/06)
   <br>
  
New floor tile (6/26/06)
   <br>
  
Work in cafateria (6/23/06)
   <br>
  
Air filtration equip (6/26/06)
   <br>
  
New facility slab (6/26/06)
   <br>
  
Hall ceiling removed (6/26/06)
   <br>
  
Auditorium (6/26/06)
   <br>
  
Existing elec box (6/26/06)
   <br>
  
Stored masonry (6/26/06)
   <br>
  
Repair of seteps at auditirium (6/26/06)
   <br>
  
Plumb parts (6/26/06)
   <br>
  
Sored const mat (6/26/06)
   <br>
  
Remove lockers (6/26/06)
   <br>
  
Stored cabinets (6/26/06)
   <br>
  
New floor tiles (6/26/06)
   <br>
  
New water heater (6/26/06)
   <br>
  
Page: 1 2 3 4 Next