Saturday, September 04, 2010

Login
 
Construction Updates
 
 
Project is complete.
 
     
 
Lamar CISD Project Photos
 
 
   <b></b>   
Hutchison Elementary School
Page: 1 2 Next
 Sort By  
Main Entrance
   <br>
  
Library
   <br>
  
Bus Drop-Off
   <br>
  
Gymnasium
   <br>
  
Corridor
   <br>
  
Front Entry
   <br>
  
Drop Off Area (07-25-05)
   <br>
  
Completed Administration Area (06-24-05)
   <br>
  
Front Elevation (06-24-05)
   <br>
  
LCISD Maintenance Training (06-21-05)
   <br>
  
Front Entrance (06-07-05)
   <br>
  
Restroom Floor Tile (06-07-05)
   <br>
  
Restroom Wall Tile (06-07-05)
   <br>
  
Kitchen Equipment Installation (06-07-05)
   <br>
  
Metal Shelving (06-07-05)
   <br>
  
Front Entrance 1 (06-07-05)
   <br>
  
Casework Installation (06-07-05)
   <br>
  
Data Cabling (05-16-05)
   <br>
  
Electric Drinking Fountain (05-16-05)
   <br>
  
Ceiling Grid Installation (05-16-05)
   <br>
  
Detention Pond (05-16-05)
   <br>
  
Terrazzo (05-03-05)
   <br>
  
Terrazzo 2 (05-03-05)
   <br>
  
Millwork Installation (05-03-05)
   <br>
  
Restroom Tile 1 (05-03-05)
   <br>
  
Restroom Tile (04-12-05)
   <br>
  
Classroom Finishes (04-12-05)
   <br>
  
Restroom Tile Installation (04-12-05)
   <br>
  
Corridor Drywall Finish (04-12-05)
   <br>
  
Canopy Exterior Framing (03-22-05)
   <br>
  
Corridor Stud Installation (03-02-05)
   <br>
  
Interior Stud Installation (03-02-05)
   <br>
  
Interior Drywall Installation (03-15-05)
   <br>
  
Interior CMU Primer Application (03-15-05)
   <br>
  
Interior Construction (02-22-05)
   <br>
  
Exterior Masonry (02-22-05)
   <br>
  
Ductwork Installation (02-22-05)
   <br>
  
Front Entrance Steel (02-22-05)
   <br>
  
Exterior Sheathing (02-09-05)
   <br>
  
Exterior CMU Installation (02-02-05)
   <br>
  
Masonry Mockup (02-02-05)
   <br>
  
Lightweight Concrete Roof Deck (02-02-05)
   <br>
  
Interior Stud Installation (02-02-05)
   <br>
  
Metal Stud Installation (01-11-05)
   <br>
  
CMU Block Layout (01-11-05)
   <br>
  
Roof Deck Installation (01-11-05)
   <br>
  
Ductwork Installation (01-05-05)
   <br>
  
Sprinkler Pipe Installation (01-05-05)
   <br>
  
Steel Structure (01-05-05)
   <br>
  
Pouring the Slab (11-10-04)
   <br>
  
Hanging a Beam (11-10-04)
   <br>
  
Securing a Beam (11-10-04)
   <br>
  
Working on the Underground Utilities (11-10-04)
   <br>
  
Setting a Steel Beam (11-10-04)
   <br>
  
1st Slab Pour 3 (10-19-04)
   <br>
  
1st Slab Pour (10-19-04)
   <br>
  
1st Slab Pour 2 (10-19-04)
   <br>
  
Site Work Progressing 3 10-18-04
   <br>
  
Site Utilities 10-1-04
   <br>
  
Site Work Progressing 10-18-04
   <br>
  
Page: 1 2 Next
Showing item(s) 1 - 60 of 72 
 
     
 